My best solution is to go with a stainless box bowsprit, and weld short sampson posts to the bowsprit, and seal up the holes through the deck.
Otherwise, if you keep the wood bowsprit, still seal up the holes in the deck, and use good 12" to 14" cleats, with backing plates under the deck.